
Generator Rental
80 – 1,000 kVA
Standby and prime power generators with cables and accessories supplied.
Generators · Panels · Power Systems · Saudi Arabia
Rental from 80 kVA to 1,000 kVA · Load banks from 30 kW to 3,200 kW · Testing, commissioning and responsive support.
From the fuel tank to the load — every link engineered, tested and documented by one team.
From testing and programming to rental and load bank testing — everything a standby or prime power system needs.
Generators, resistive load banks and rack-mount units, ready for projects across the Kingdom.

80 – 1,000 kVA
Standby and prime power generators with cables and accessories supplied.

30 – 3,200 kW
Step-load testing, full-load heat runs and wet-stacking removal.

6 – 10 kW
Compact units that simulate IT load for data hall commissioning.

Six tests that confirm a generator will perform when it's actually needed.
Six steps, one accountable team, from the first survey to the final signature.
Site survey & assessment
Engineering & proposal
Manufacturing & supply
Installation
Testing & commissioning
Handover & support
One team accountable from the first survey to the final signature.
Standby and prime power for the sectors that can't afford downtime.
Five regions, every major city, and others on request.
Hands-on with every major generator and controller brand.
Survey, engineering, manufacturing, installation, testing and support — one accountable team.
ATS, synchronization, MDB, MCC and fully custom electrical panels.
Prove performance before it's needed, at any scale.
Projects across every region of Saudi Arabia.
Complete test and commissioning reports, every time.
Straight answers about rental, testing and coverage.
GPS rents generators from 80 kVA up to 1,000 kVA, with power cables and accessories supplied, for projects throughout Saudi Arabia.
Yes. Our engineers work hands-on with all major brands and controller platforms, including ComAp, Deep Sea, Woodward, Basler, DEIF, Lovato, Kohler, Caterpillar, Olympian and others. Brand names are trademarks of their respective owners.
A load bank applies a controlled, measurable load to a generator to prove it performs under real demand — step-load testing, full-load heat runs, voltage and frequency regulation, transient response and wet-stacking removal. GPS offers resistive load banks from 30 kW to 3,200 kW and rack-mount units from 6 kW to 10 kW for data hall commissioning.
GPS serves the whole Kingdom — Northern (Tabuk, Hail, NEOM), Western (Jeddah, Makkah, Madinah, Yanbu), Central (Riyadh, Qassim), Eastern (Dammam, Khobar, Jubail, Al-Ahsa) and Southern (Abha, Jazan, Najran) regions, and other cities on request.
Yes — ATS panels, synchronization and load-sharing panels, MDB/SMDB, generator control panels, MCC, AMF panels, power distribution panels and fully custom electrical and control panels, including modification, upgrading, testing and commissioning.
Six steps: site survey & assessment, engineering & proposal, manufacturing & supply, installation, testing & commissioning, and handover & support — one team accountable from the first survey to the final signature.
Tell us what you need — we'll respond with a plan, not a sales pitch.