Power that is commissioned, not assumed.

Data halls tolerate no ambiguity: standby generation, UPS, cooling and power distribution all have to prove themselves under real load before the first server goes live. That is why load bank testing, synchronization and documented commissioning matter as much as the generator itself.

What matters most

  • N+1 / 2N generator synchronization
  • Rack-mount load banks for pre-go-live commissioning
  • UPS testing and maintenance